Caruso Self Storage Facility
- Location: Revere, MA
- Size: ~500 tons; 121,000 sq.ft.
- Erection start date: May 2018
Cape Cod 54 Hyannis Banking
- Location: Hyannis, MA
- Size: 490 tons; 82,000 sq.ft.
- Erection start date: May 2018
Mansfield New Public Safety Building
- Location: Mansfield, MA
- Size: ~190 tons; 45,000 sq.ft.
- Erection start date: ~April 2018
Management Team
With over 40 years of combined experience in the structural steel industry, our management team not only brings an unprecedented knowledge base, but also the field experience to challenge any projects and its inevitable bumps. They are also highly skilled in performing onsite fabrications to ensure that any delays or issues are mitigated as much as possible. The management team places a great deal of emphasis in maintaining all levels of communication and ensuring that all safety protocols are strictly adhered to.
UConn STEM New Research Facility
Location: Storrs, CT
General Contractor: Dimeo Construction
Steel Fabricator: Shepard Steel
Square Footage: 227,000 sq. ft.
Approximate tonnage: 1800 tons
Arlington High School Phase 1
Location: Arlington, MA
General Contractor: Consigli Construction
Steel Fabricator: Acier Trimax
Square Footage: 73,000 sq. ft.
Approximate tonnage: 485 tons
Essex Landing Bldg. #3
Location: Saugus, MA
General Contractor: T.B Holdings
Steel Fabricator: Acier Trimax
Square Footage: 120,000 square feet
Approximate tonnage: 672 tons
Pentucket Regional School
Location: Pentucket, MA
General Contractor: W.T. Rich
Steel Fabricator: AcierTrimax
quare Footage: 243,700 sq. ft.
Approximate tonnage: 1425 tons
VA Worcester CBOC
Location: Worcester, MA
General Contractor: Suffolk Construction
Steel Fabricator: Supermetal
Square Footage: 111,000 sq. ft.
Approximate tonnage: 706 tons